⚙️ Product Description
Products are widely used in medical, communications, optoelectronics, bicycle, motorcycle, automotive, office, automation equipment and other industries.
| Service Description |
| Finish |
Sandblasting, Anodize color, Blackenning, Zinc/Nickl Plating, Polish, Power coating, Passivation PVD, Titanium Plating, Electrogalvanizing, Electroplating chromium, electrophoresis, QPQ, Electro Polishing, Chrome Plating, Knurl, Laser etch Logo, etc. |
| Main Equipment |
CNC Machining center (Milling), CNC Lathe, Grinding machine, Cylindrical grinder machine, Drilling machine, Laser Cutting Machine, etc. |
| Drawing Format |
STEP, STP, IGS, CAD, PDF, DWG, DXF etc. or samples. |
| Tolerance |
+/-0.01mm ~ +/-0.05mm |
| Surface Roughness |
Ra 0.1~3.2 |
| Inspection |
Complete inspection lab with Micrometer, Optical Comparator, Caliper Vernier, CMM, Depth Caliper Vernier, Universal Protractor, Clock Gauge, Internal Centigrade Gauge. |
| Capacity |
CNC turning: φ0.5mm-φ150mm*300mm; CNC milling: 510mm*1020mm*500mm. |
❓ Frequently Asked Questions
What kinds of information do you need for a quotation?
You can provide 2D/3D drawings or send your sample to our factory, and we can manufacture according to your sample.
Can we sign an NDA (Non-Disclosure Agreement)?
Sure. We strictly protect our customers' intellectual property and never divulge information to third parties.
Do you provide samples?
Yes, we can provide samples for quality verification before proceeding with a mass production order.
How do you ensure product quality?
We have a professional QC department equipped with advanced measuring tools (CMM, Micrometers, etc.) to guarantee every part meets specifications.
What are the available transportation modes?
You can choose any mode of transportation, including sea delivery, air delivery, or door-to-door express services like DHL, FedEx, and UPS.
What is your typical lead time for production?
Lead times depend on the complexity and quantity of the parts. Generally, samples take 7-10 days, while mass production timelines are confirmed upon order placement.